301A SurgeIV Renovation

The computer classroom in 301A SurgeIV was renovated over the summer. The old air conditioner (known as the green monster) was removed and a new HVAC system was installed on the roof. This change should significantly reduce the noise in the room while improving the temperature.
The door was moved to the south-east corner of the room in preperation for further improvements in the future. The room was also repainted.
In addition, 301A SurgeIV was upgraded with Dell Optiplex GX110 computers (733 MHz, 192MB RAM, 10GB HD, and CD-ROM).

Return to Computer Lab Management News Briefs